Construction operations planning

 

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
Awduron: Mora-Chavarría, Ismael, Gutiérrez-Loria, Mauricio, Quirós-Campos, Jonathan
Fformat: artículo original
Statws:Versión publicada
Dyddiad Cyhoeddi:2021
Disgrifiad:This article is based on Chapter 4. Planning of construction operations of the book Construction Operations Administration of Alfredo Serpell Bley (Chile), updating and adapting the information, as well as tropicalizing, and exemplifying the reality that is lived in the construction sector in Costa Rica. Engineer Serpell focused on operations planning: “depends on the construction managers and has the most direct influence on productivity. The context of the study of operations planning will be within the framework of the overall planning of the project interrelationships between one and the other will be highlighted permanently, and especially the fact that operations planning is a by-product of general contract or project planning. ” [1]. In the context of construction, operation means that work activity that results in the placement or installation of a definable building element, Engineer Serpell mentions that a process is: “a collection of tasks related to each other by a technological structure and a sequence. Finally, a task is the most basic work item in processes and operations.” [1].
Gwlad:Portal de Revistas TEC
Sefydliad:Instituto Tecnológico de Costa Rica
Repositorio:Portal de Revistas TEC
Iaith:Español
OAI Identifier:oai:ojs.pkp.sfu.ca:article/5155
Mynediad Ar-lein:https://revistas.tec.ac.cr/index.php/tec_marcha/article/view/5155
Allweddair:Instalaciones provisionales
reglamento de construcciones - INVU
planes de operaciones
diagramas de flujo
cartas de proceso
planificación de corto plazo
implementación del sistema
Provisional facilities
construction regulations – INVU
operations plans
flowgrams
process letters
short time planning
implementation of system