Estimation of the performance of workforce and material in the application of plastering with industrialized mortar in housing projects

 

保存先:
書誌詳細
著者: Mata Abdelnour, Erick
フォーマット: artículo original
状態:Versión publicada
出版日付:2025
その他の書誌記述:In this investigation, the performance and cost of workforce, material, and equipment in the application of plaster with industrialized mortar were estimated. The measurements were made in three housing projects of one and two levels, located within Alajuela, Heredia, San José or Cartago, Costa Rica. In the first two, mortars of different brands were used, however, the application methodology was manual in both cases. In the third project the same mortar was used as one of the previous projects, but it was applied mechanically. For the data analysis obtained, the statistical student-t test was used, with a reliability of 90%. It should be noted that the results are valid only for projects with characteristics like the ones used in this study. According to the results, the cost of the plastering applied manually is very similar to the one applied with a sprayer machine, since the savings in workforce cost is approximately equivalent to the amount necessary to amortize the equipment and the additional cost of the projectable material.
国:Portal de Revistas UCR
機関:Universidad de Costa Rica
Repositorio:Portal de Revistas UCR
言語:Español
OAI Identifier:oai:portal.revistas.ucr.ac.cr:article/2274
オンライン・アクセス:https://revistas.ucr.ac.cr/index.php/rmateriales/article/view/2274
キーワード:Performance
Workforce
Plastering mortar
Sprayer machine
Rendimiento
Mano de obra
Mortero para repello
Máquina lanzadora