Ensayos de hidrogateo en la determinación de la longitud del blindaje de un tunel a presión con baja cobertura

 

Guardado en:
书目详细资料
作者: Cervantes, José Francisco
格式: artículo original
状态:Versión publicada
Fecha de Publicación:2011
实物特征:For the final line design of a pressure tunnel some factors must be taken into account to ensure it during the operating life. It is necessary to get the geological excavation data, geomechanic parameters and details of the hydraulic operation. The tunnel will be lined with steel liner at the span where it has less cover and the rock mass strength is not enough to ensure an adequate in situ compressive stress to prevent hydraulic jacking. To identify this phenomena a hydraulic jacking test is used inside the underground opening to study its hydromechanic behavior. The Tunnel I of the Toro Hydroelectric Complex Project was excavated with little cover and the metodology explained above has been used which defined a length of 375 for the steel liner.
País:Portal de Revistas UCR
机构:Universidad de Costa Rica
Repositorio:Portal de Revistas UCR
语言:Español
OAI Identifier:oai:archivo.portal.ucr.ac.cr:article/13286
在线阅读:https://archivo.revistas.ucr.ac.cr/index.php/geologica/article/view/13286