Sequencing of operations by simulation in the company Puntadas, S.G.

 

Gorde:
Xehetasun bibliografikoak
Egileak: Orozco-Crespo, Erick, Sablón-Cossío, Neyfe, Rodríguez-Sánchez, Yadamy, González-Garzón, Jenifer Cristina, Sánchez-Galván, Fabiola
Formatua: artículo original
Egoera:Versión publicada
Argitaratze data:2021
Deskribapena:The sequencing of customer orders is a challenge for scheduling operations in a company. This becomes even more complex if it is a company in the textile sector, since it responds to increasingly personalized orders. The order given to these orders has a significant impact on the performance of operations. In this context, a simulation model was designed in FlexSim to measure the impact of the application of different priority rules for the sequencing of customer orders in the case of the operations of the company “Puntadas, S.G.”. The results were presented by sequencing the orders corresponding to four weeks of the Master Production Program (MPS) in the simulation model. With this, it was determined that the Shortest Processing Time (SPT) priority rule would be the one that would best impact the general performance of operations, especially through an increase in reliability of 4.49%, compared to the First-Come First-Served rule. (FCFS) which is currently implemented.
Herria:Portal de Revistas TEC
Erakundea:Instituto Tecnológico de Costa Rica
Repositorio:Portal de Revistas TEC
Hizkuntza:Español
OAI Identifier:oai:ojs.pkp.sfu.ca:article/4823
Sarrera elektronikoa:https://revistas.tec.ac.cr/index.php/tec_marcha/article/view/4823
Gako-hitza:Sequencing
simulation
priority rules
operation scheduling
Secuenciación
simulación
reglas de prioridad
programación de las operaciones